LEOPALACE RESORT GUAM | ENGINEERING & FACILITIES MAINTENANCE
OPERATIONS BOARD
06:30
MONDAY 07/27/2026 ChST
A-Shift EM
James Calma
B-Shift EM
Brandon Wallace
C-Shift Team Lead
Francis Ventura
EFM Administrator
Kaisha Atalig
NORMAL OPSEFM operating status
11
OOO / OOS Rooms
Latest confirmed 07/27 · D208 at 42 days
5
Operational Priorities
D702 · D208 · D207 · HVAC · Refrigeration
6
WOs · Latest Brief
Latest reporting window ended 07/27
2
Return Targets Overdue
D508 · D603 · target was 07/27
4
Watch Areas
Plumbing · HVAC · Refrigeration · Structural
Operational Priority Board
SAFETY
D702
CEILING COLLAPSE
Barricaded · structural recovery · release decision.
Target 07/31
REVENUE
D208
A/C NOT COOLING
42 days OOO · maintain recovery escalation.
Target 12/31
WATER
D207
WATER HEATER SUPPLY LEAK
Pinhole supply leak · repair · pressure test · inspect damage.
Target 08/01
HVAC
HVAC WATCH
MULTIPLE LEAKS + NO COOL
Condensate / room leaks + repeat no-cool calls.
Prioritize repeat failures
REFRIG
F&B REFRIGERATION
PM NEEDED · REFRIGERATORS + ICE MACHINES
Okibi · Sabana · TanganTangan.
PM + function / reliability check
OOO / OOS RETURN WATCH
OVERDUE 07/27D508 · D603
07/29D104 · H355
07/31D702 · H326 · H332 · H541
08/01D207
08/03B910
12/31D208
GM Actions · Priority 1 / 5
C402 · materials / close WO 1026PAST DUE
Brizo Kitchen · restore / replace refrigeratorPAST DUE
H355 · finish repair / release07/29
D702 · structural recovery / release07/31
WWTP · remove trash07/31
Treasure Garage · trash / barriers07/31
Street signs · replace damaged / missing08/10
Clutch Camp · Session 2 · venues / power / A/CACTIVE 07/27–31
Old Boutique + Track · daily camp supportTODAY
Hotel Pool · camp support / readinessTHU 07/30
Strike Zone · camp / equipment readinessFRI 07/31
Cruz Birthday · Poolside · setup / power / lightsSAT 08/01
Current · 10:54 ChST
86°F · RH 75%
N 9 mph · vis 10 mi · heat index 97°F.
Today
SCT SHWRS · ISO T-STORMS
High 88°F · PoP 40% · E–NE 10–20 mph.
Drone Window · Remaining
13:00–16:00 ChST
Potential window · convection remains possible.
TCCOR
TCCOR 4
Normal readiness.
Outdoor EFM
RECHECK BEFORE WORK
Roof · lift · paint · exterior electrical.
PIC Checks
VERIFY BEFORE LAUNCH
Wind · gusts · rain · vis · airspace · obstacles · LZ.
POTENTIAL OUTAGE WINDOW
17:00–18:00
Summer watch. Keep generator / ATS readiness in view and avoid nonessential utility-sensitive work.
POTENTIAL OUTAGE WINDOW
20:00–21:00
Summer watch. Protect critical loads and maintain quick-response coverage.
POTENTIAL OUTAGE WINDOW
22:00–23:00
Summer watch. Maintain generator, ATS and critical-load readiness through the final window.