Critical Action Board 07/24 brief · exceptions requiring action
CRITICAL
D702 · Building D
Entrance ceiling collapse with structural and life-safety exposure. Barricaded and OOO since 07/08.
Return
07/25
07/25
URGENT
D208 · Building D
A/C not cooling. Longest running revenue-room loss on property, now 38 days OOO.
Return
12/31
12/31
URGENT
Zefiro Women's Restroom
Plumbing leak in the public restroom serving the Zefiro Ballroom event venue. Clear and dry before next booking.
Due
Today
Today
URGENT
H326 · Building H
Ceiling leak from clogged drainage line. Line vacuumed; unit remains on condensate watch before ceiling repair/release.
Return
07/28
07/28
URGENT
Kitchen · Back of House
Kitchen sink clogged and slowing food production. Clear line and confirm drainage before next meal period.
Due
Today
Today
Critical Infrastructure 07/24 brief status
Power
Operational
Water
Degraded · High
WWTP / Drainage
Degraded · Med
HVAC
Degraded · High
Fire Alarm
Operational
Fire Pump
Operational
Generators
Operational
Elevators
Operational
Pools
Operational
Internet
Operational
Gas
Operational
Lift Stations
Not in brief · Verify
Today & Next · EFM-Relevant Events arrival surge ~30 rooms @ 15:00
Clutch Summer CampOld Boutique · Track · Strike Zone · Hotel Pool
FINAL DAYALV Taiwan Student GroupQuest · Kanta/Lago · Strike Zone · Four Peaks Pool
DEPARTS TODAYRomero BirthdayHotel Pool · power / lighting / setup support
07/25Harassment Prevention TrainingRoom / date still pending with Convention
TBC